REPAIR HARNESS, LOW OIL SENSOR, INCL (1) 10 INCH LONG LEAD WIRE, DESIGNED TO REPLACE FACTORY STYLE PLUG
Ford Mustang Years:
1984 (84), 1985 (85), 1986 (86), 1987 (87), 1988 (88), 1989 (89), 1990 (90), 1991 (91), 1992 (92), 1993 (93), 1994 (94), 1995 (95), 1996 (96)
1984-1993 MUSTANG 5.0L, W/ LOW OIL SENSOR
1994-1995 MUSTANG 5.0L, W/ LOW OIL SENSOR
1996-1996 MUSTANG 4.6L, W/ LOW OIL SENSOR
0-0 THIS UNIT IN TYPICALLY DAMAGED DUE TO OIL LEAKS FROM THE
0-0 SENSORS GASKET AND OR HEAT FROM THE MOTOR OVER TIME.
WARNING: This product can expose you to chemicals including lead and DEHP, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.