Please click here for the latest news regarding NPD service/status during COVID-19 crisis.
National Parts Depot
Search ...

Repair Harness, Low Oil Sensor, Incl (1) 10 Inch Long Lead Wire, Designed To Replace Factory Style Plug


Full Description
Repair Harness, Low Oil Sensor, Incl (1) 10 Inch Long Lead Wire, Designed To Replace Factory Style Plug
Item # M-6R624-1
MPN # M-6R624-1
Brand: Motorcraft

$74.50
In Stock!




In Store Availability
FL
NC
MI
CA
DESCRIPTION

REPAIR HARNESS, LOW OIL SENSOR, INCL (1) 10 INCH LONG LEAD WIRE, DESIGNED TO REPLACE FACTORY STYLE PLUG

Ford Mustang Years:

1984 (84), 1985 (85), 1986 (86), 1987 (87), 1988 (88), 1989 (89), 1990 (90), 1991 (91), 1992 (92), 1993 (93), 1994 (94), 1995 (95), 1996 (96)

Vehicle Information

Year-Range (bold)      Model (bold)      Fits/Applications

1984-1993 MUSTANG 5.0L, W/ LOW OIL SENSOR

1994-1995 MUSTANG 5.0L, W/ LOW OIL SENSOR

1996-1996 MUSTANG 4.6L, W/ LOW OIL SENSOR

0-0 THIS UNIT IN TYPICALLY DAMAGED DUE TO OIL LEAKS FROM THE

0-0 SENSORS GASKET AND OR HEAT FROM THE MOTOR OVER TIME.

WARNING: This product can expose you to chemicals including lead and DEHP, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

REVIEWS

0 Reviews
 
Write a Review